The Bossier Levee District installed a new outfall pipe on Red Chute Bayou near Cane Bend Subdivision in the fall of 2008 with assistance from the Bossier Parish Police Jury. Outfall pipes allow water to drop into the Bayou without eroding the banks. This outfall pipe replaced a rusted existing pipe which had significantly deteriorated. The outfall pipe drains water from an old cut-off section of Red Chute Bayou which was formed when Red Chute Bayou was realigned many years ago.