The Bossier Levee District Flat River Bank Stabilization Project is located along the east bank of Flat River and runs from Shed Road to approximately 2000 feet north of Coy Road near Stockwell Subdivision. This project was developed to repair slopes along the Flat River which had begun to erode and slide, threatening homes located along the top bank of the river.
The project was constructed in five (5) phases with final completion in March of 2012. Phase I was funded by the Levee District. The remaining phases were funded jointly by the Levee District and the State of Louisiana through the capital outlay process.