APPLICATIONS REVIEW COMMITTEE
(Tim Larkin, Mark Long, Bill Alley, and Suma Stelly)
8:30 a.m. – 9:00 a.m. Mark Long, Operations Coordinator, BLD to discuss upcoming potential projects & plats:
1. Discuss Red Chute Levee Raise Project.
2. Discuss Red Chute Levee Temp Access right of ways.
3. Discuss Victoria Meadows Plot Plan of: lot 68, Victoria Meadows – Unit 2, Units 2A, 3A, and 3B.
4. Discuss Mr. Cordaro’s’s property improvements due to the potential effects caused from the Flat River Stabilization Project Phase 5 previously completed in 2012.
9:00 a.m. – 9:15 a.m. Charlie Coyle, Coyle Engineering to discuss three Subdivision Plats: Airline Plaza Subdivision, Bennett ubdivision, and JSP Industrial Park.
9:15 a.m. – 9:30 a.m. John LeBlanc, AEP/SWEPCO, seeking permit to install 2 galvanized h-frames that will penetrate the toe of the Red River Levee at the intersection of Old Minden Road and Hamilton Rd and placed inside the station fence 5 feet.
9:30 a.m. – 9:45 a.m. Donald Clayton, TRC Engineers representing the City of Bossier City: As part of construction; the existing road to the Bossier City Water Treatment plant will be reconstructed to an elevation approximately 1 foot above the existing roadway and thus will result in a larger opening in the current Red River Levee.
9:45 a.m. – 10:00 a.m. Donald Clayton, TRC Engineers on behalf of the City of Bossier City: Construction of a storm water pump station for the proposed Walter O. Bigby bridge and a 42’ gravity discharge outfall pipe thru the Red River Levee.
In accordance with the Americans with Disabilities Act, if you need special assistance, please contact Deanna Rabb, at (318)746-7151 describing the assistance that is needed.